Search
  • Classic - Fenger Construction '08 Mix Photo
    I did the trim and nottie pine on the walls also Still more to do though
  • Classic - Fenger Construction '08 Mix Photo
    cement board down, boxes of tile out ready to get put down
  • Classic - Fenger Construction '08 Mix Photo
    room 1 sanded, took 3 days to sand the old flooded reinstaled red oak floors when a new floor that size would take me 1 day.
  • Classic - Fenger Construction '08 Mix Photo
    railing started
  • Classic - Fenger Construction '08 Mix Photo
    the baconey
  • Classic - Fenger Construction '08 Mix Photo
    airal view of the rails lol just lacking a few pickets at the top of the stairs
  • Classic - Fenger Construction '08 Mix Photo
    bed 1 reinstaling old red oak floors
  • Classic - Fenger Construction '08 Mix Photo
    huge maple tree I cut down notice the power, cable and phone line that ran throught it and it was leaning toward the high lines and a house
  • Classic - Fenger Construction '08 Mix Photo
    bathroom half tiled
  • Classic - Fenger Construction '08 Mix Photo
    room 2 sanded hard wood
  • Classic - Fenger Construction '08 Mix Photo
    hall and room 3 sanded
  • Classic - Fenger Construction '08 Mix Photo
    kitchen stripped before
  • Classic - Fenger Construction '08 Mix Photo
    sanded
  • Classic - Fenger Construction '08 Mix Photo
  • Classic - Fenger Construction '08 Mix Photo
    1st coat of poly
More
Close

Press esc to close.
Close
Press esc to close.
Close

Connecting to your webcam.

You may be prompted by your browser for permission.